The semi-automatic parking lot is constructed on a land area of 300 square meters with two car lifts, in 10 floors, with capacity of 113 cars. The unique feature of the project is a lift mechanism up to thirty meters, based on a high-reliability hydraulic system.

The delivery of the parking system was carried out in the second half of the year 2016 and was testable exploited, but the final operation would be carried out in the beginning of the year 2018.

Location